Parking Facilities
FY22 $25k annual CIP BI-19-PL-17: VAUGHAN-WORTH-BRIDGE STRATEGIC VISION DEVELOPMENT
Description: In 2017, the City Council adopted a strategic vision for the area encompassing the Vaughan Mall, Worth Lot and Bridge Street Lot. The Vision is to transform the surface parking and Vaughan Mall into new and renewed public spaces. This project identifies funding to take steps to develop this vision, which may include concept development; design development and site analysis; and funding for interim demonstration projects to illustrate the Vision as well as progressing the vision to master plan level design.
FY22 $6M CIP BI-95-PW-43: HANOVER PARKING FACILITY – CAPITAL IMPROVEMENTS
Description: This project provides funding for maintenance at the Hanover Parking Garage. Funding is allocated on a scheduled basis to fund major renovation needs for the original structure. In FY18, a structural evaluation update was completed by Walker Consultants, identifying the upgrades necessary to be able to continue to use the Facility. Construction will begin after the City’s new parking garage is completed.
FY22 $30k CIP BI-20-PW-45: LEVEL 3 (480 VOLT) ELECTRIC STATION
Description: The City of Portsmouth continues to work on expanding its EV charging station network. In addition to its station at Hanover Garage, the City has added a new station in the City Hall Lower Lot, located at the corner of Junkins Avenue and South Streets. The Foundry Garage is equipped with three (3) EV Stations.
FY22 $150k CIP TSM-12-PW-53: PARKING LOT PAVING
Description: Similar to streets, parking lots require maintenance and periodic repaving. The City owns metered parking lots (Bridge Street, Worth Lot, Court Street and Memorial Bridge Lot) and six unmetered parking lots (Prescott Park, Parrott Avenue, South Mill Pond, Leary Field, Municipal Complex and Rockland Street).
FY22 $45k CIP TSM-08-PW-54: PARKING METERS
Description: The City has replaced its aging multi-space parking meters with updated technology, allowing for a greatly enhanced user experience. These funds cover the continued replacement of meters as needed.