Pease Wastewater Treatment Facility Upgrade

Cover of Pease WWTF Upgrade Plan Set

Project Description:

This project will upgrade the Pease Wastewater Treatment Facility to address treatment capacity limitations based on projected buildout of the Tradeport for both domestic and industrial customers. Much of the Pease Tradeport WWTF equipment has reached the end of its service life and cannot accommodate the future flows and loads associated with the buildout. Improvements include upgrades to the liquid and solids treatment processes and ancillary systems to address nitrogen removal requirements. The project includes an electrical system upgrade, mechanical equipment replacement, expansion of the secondary treatment capacity and conversion of the effluent disinfection system from chlorination/dechlorination to UV. Construction is anticipated to take approximately 2 years, and the facility will remain in operation throughout construction.

Estimated Completion:   This project is currently in the design phase. Construction is anticipated to take approximately 2 years, and the facility will remain in operation throughout construction.

Cost $25,000,000

Funding Source Portsmouth Sewer Bonded Monies and NHDES State Revolving Fund

Designer/Contractor:  Designer: AECOM, Contractor: TBD

Project Manager:

Erich Fiedler, City Engineer
esfiedler@portsmouthnh.gov
603.766.1421

Design Detail

These preliminary design plans detail the extent of this project, covering site grading and drainage, hydraulics, piping, the electrical plan for the site and five buildings housing facility operations.

Overall Site Plan

Site Grading & Drainage

Hydraulic Profile

Electrical Site Plan

Yard Piping

Chemical Building 1

Chemical Building 2

Electrical Building

Blower Building

Administration Building

 

Progress Reports

To come.